Sold by Mighty Ape
Construction disputes by their very nature are often complex, sometimes multi-party disputes, many of which are not suited to either adjudication or traditional form of litigation (which are often slow, expensive and divisive). The sheer complexity of construction creates a compelling case for the introduction of alternative approaches within this adversarial industry. This book traces the history, development, current status and future direction of Alternative Dispute Resolution (ADR) in the UK construction industry.
It draws on the largest collection of Royal Institution of Chartered Surveyors-funded surveys on Scottish and English disputants’ perceptions and attitudes to ADR. It includes an examination of the key legislative and regulatory principles relating to ADR in the Construction sphere. The study also evaluates the role and functions of the Technology and Construction Court (TCC) in England and, with reference to case law, identifies its facilitative approach to ADR. The coherence of the TCC’s approach to issues such as refusal to resort to ADR is also examined. It will be a valuable reference work for scholars and practitioners in construction and the built environment, in the UK and internationally.
Author Biography
Andrew Agapiou is Associate Professor, Department of Architecture, University of Strathclyde, Glasgow, Scotland
We are committed to protecting your rights under the Consumer Guarantees Act and working with our suppliers to assist with warranty claims. Products sold by Mighty Ape will be covered by a Manufacturer's Warranty for at least a one-year period from the date of purchase.
Your warranty will cover any manufacturing defects which, if existing, will present themselves within this warranty period.
Your warranty will not cover normal wear and tear, faults caused by misuse, and accidents which cause damage or theft caused after delivery. Using the product in a way it is not designed for will void your warranty.
Please refer to our Help Centre for more information.