Sold by Mighty Ape
Introductory technical guidance for civil and geotechnical engineers interested in flood wall engineering. Here is what is discussed: 1. PRESSURE CALCULATIONS 2. SEEPAGE ANALYSIS BY LINE-OF-CREEP METHOD 3. SEEPAGE ANALYSIS BY METHOD OF FRAGMENTS 4. SEEPAGE ANALYSIS BY THE FINITE ELEMENT METHOD 5. UPLIFT CALCULATIONS FOR ROCK FOUNDATIONS 6. EFFECT OF DRAINS 7. SURGE AND WAVE LOADS.
We are committed to protecting your rights under the Consumer Guarantees Act and working with our suppliers to assist with warranty claims. Products sold by Mighty Ape will be covered by a Manufacturer's Warranty for at least a one-year period from the date of purchase.
Your warranty will cover any manufacturing defects which, if existing, will present themselves within this warranty period.
Your warranty will not cover normal wear and tear, faults caused by misuse, and accidents which cause damage or theft caused after delivery. Using the product in a way it is not designed for will void your warranty.
Please refer to our Help Centre for more information.