Sold by Mighty Ape
This book constitutes the strictly refereed post-workshop proceedings of the International Workshop on Job Scheduling Strategies for Parallel Processing, held in conjunction with IPPS ’96 symposium in Honolulu, Hawaii, in April 1996.The book presents 15 thoroughly revised full papers accepted for inclusion on the basis of the reports of at least five program committee members. The volume is a highly competent contribution to advancing the state-of-the-art in the area of job scheduling for parallel supercomputers. Among the topics addressed are job scheduler, workload evolution, gang scheduling, multiprocessor scheduling, parallel processor allocation, and distributed memory environments.
We are committed to protecting your rights under the Consumer Guarantees Act and working with our suppliers to assist with warranty claims. Products sold by Mighty Ape will be covered by a Manufacturer's Warranty for at least a one-year period from the date of purchase.
Your warranty will cover any manufacturing defects which, if existing, will present themselves within this warranty period.
Your warranty will not cover normal wear and tear, faults caused by misuse, and accidents which cause damage or theft caused after delivery. Using the product in a way it is not designed for will void your warranty.
Please refer to our Help Centre for more information.