Sold by Mighty Ape
This book constitutes the thoroughly refereed post-workshop proceedings of the 4th International Workshop on Job Scheduling Strategies for Parallel Processing held during IPPS/SPDP’98, in Orlando, Florida, USA, in March 1998. The 13 revised full papers presented have gone through an iterated reviewing process and give a report on the state of the art in the area.
We are committed to protecting your rights under the Consumer Guarantees Act and working with our suppliers to assist with warranty claims. Products sold by Mighty Ape will be covered by a Manufacturer's Warranty for at least a one-year period from the date of purchase.
Your warranty will cover any manufacturing defects which, if existing, will present themselves within this warranty period.
Your warranty will not cover normal wear and tear, faults caused by misuse, and accidents which cause damage or theft caused after delivery. Using the product in a way it is not designed for will void your warranty.
Please refer to our Help Centre for more information.