Non-Fiction Books:

NASA Work Breakdown Structure (WBS) Handbook

NASA SP-2016-3404 Rev.1
Click to share your rating 0 ratings (0.0/5.0 average) Thanks for your vote!

By:

Format:

Paperback / softback
$65.99 was $82.99
Available from supplier

The item is brand new and in-stock with one of our preferred suppliers. The item will ship from a Mighty Ape warehouse within the timeframe shown.

Usually ships in 3-4 weeks

Buy Now, Pay Later with:

Afterpay is available on orders $100 to $2000 Learn more

Availability

Delivering to:

Estimated arrival:

  • Around 28 Jun - 10 Jul using International Courier

Description

NASA Work Breakdown Structure (WBS) Handbook NASA SP-2016-3404 We print NASA handbooks and standards for the convenience of those that use them on a daily basis. We print all of these a full 8 1/2 by 11 with large text so they are easy to read. Yes, color books are expensive to print so unless the information relies on the use of color for proper interpretation or understanding, we print most books in black and white to keep the cost down. All these documents are available for download for free from NASA, however printing them all over a network printer would take days. Why buy a book you can download free? We print this so you don't have to. All these books are available for free download from the government web site. Some are available only in electronic media. Some online docs are missing pages or barely legible. We at 4th Watch Publishing are former government employees, so we know how government employees actually use the standards. When a new standard is released, an engineer prints it out, punches holes and puts it in a 3-ring binder. While this is not a big deal for a 5 or 10-page document, many NIST documents are over 100 pages and printing a large document is a time- consuming effort. So, an engineer that's paid $75 an hour is spending hours simply printing out the tools needed to do the job. That's time that could be better spent doing engineering. We publish these documents so engineers can focus on what they were hired to do - engineering. It's much more cost-effective to just order the latest version from Amazon.com If there is a standard you would like published, let us know. Our web site is usgovpub.com Here are other NASA titles we publish: NASA-STD-5001BStructural Design and Test Factors of Safety for Spaceflight Hardware NASA-STD-5006AGeneral Welding Requirements for Aerospace Materials NASA-STD-5008BProtective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment NASA-STD-5009ANondestructive Evaluation Requirements for Fracture-Critical Metallic Components NASA-STD-5012BStrength and Life Assessment Requirements for Liquid-Fueled Space Propulsion System Engines NASA-STD-5019AFracture Control Requirements for Spaceflight Hardware NASA-STD-5005DStandard for The Design and Fabrication of Ground Support Equipment NASA-HDBK-8739.21Workmanship Manual for Electrostatic Discharge Control NASA-HDBK 8739.23ANASA Complex Electronics Handbook for Assurance Professionals NASA-HDBK-8719.14 Handbook for Limiting Orbital Debris NASA-HDBK-8709.22Safety and Mission Assurance Acronyms, Abbreviations, and Definitions NASA-HDBK-7009NASA Handbook for Models and Simulations: An Implementation Guide For NASA-STD-7009 NASA-HDBK-8739.19-2Measuring and Test Equipment Specifications NASA Measurement Quality Assurance Handbook - Annex 2 NASA-HDBK-8739.19-3Measurement Uncertainty Analysis Principles and Methods NASA Measurement Quality Assurance Handbook - Annex 3 NASA-HDBK-8739.19-4Estimation and Evaluation of Measurement Decision Risk NASA Measurement Quality Assurance Handbook - Annex 4 NASA RCMReliability-Centered Maintenance Guide for Facilities and Collateral Equipment
Release date Australia
February 2nd, 2019
Author
Audience
  • General (US: Trade)
Pages
70
Dimensions
216x279x5
ISBN-13
9781795700207
Product ID
29898161

Customer reviews

Nobody has reviewed this product yet. You could be the first!

Write a Review

Marketplace listings

There are no Marketplace listings available for this product currently.
Already own it? Create a free listing and pay just 9% commission when it sells!

Sell Yours Here

Help & options

Filed under...